Building Permits

Permits: grading, erosion, building inspections, building permit application (by State Law, the Building Inspector has 10 Days to approve a building permit application. Early Start may also be considered.

Commercial Buildings: Upon review by the State, Planning and City Council, the Building Inspector will review the plans and issue permits. A Zoning Permit may be necessary as well that would be issued by the Zoning Inspector.

The Building Permit Process:

How to Contact the Inspector:

Permits are required for the following:

Permits are not required for the following:

To obtain an application:

Returning completed applications/submitting plans:

Inspections are required prior to concealing work! Working without permits is subject to double fees!

Call for inspections at (608) 444-0372

Items needed to issue Building Permits for:

New Homes:

  1. 2 sets of building plans drawn to scale with elevations
  2. 2 plot plans of the land (showing elevations, distances to lot lines and building sizes)
  3. 1 copy of Thermal performance Sheets (heat loss calculations) Res Check Software also accepted
  4. Applications to be filled out: Uniform Building Permit
  5. 2 copies of erosion Control Plan shown on a plot plan

Additions, remodels & accessory structures:

  1. 2 sets of building plans
  2. 2 copies of plot plans of the land (showing elevations, distance to lot lines, & building sizes)
  3. Applications to be filled out: Uniform Building Permit.
  4. 2 copies of erosion Control Plan shown on plot plan for additions only

Commercial:

  1. 2 sets State approved building plans and specifications as needed per COMM 60.12
  2. 2 copies of plot plan of the property showing all buildings located on it to scale
  3. Applications to be filled out: Uniform Building Permit

Before you begin your project, you will be required to have the zoning of your property checked.

An additional Zoning Permit is required from the Zoning Administrator for new buildings or additions to commercial, multi family or industrial buildings. These projects will require additional procedures. Please contact Mark Steward for more information. The City wants to work with you to make your project a success for both you and the entire community.